- Home
- Government
- Departments O-Z
- Sewer Department
- Current Projects
Current Projects
-
Anaerobic Digester Feasibility Study
The Town of Nantucket Sewer Department and Weston & Sampson are conducting a feasibility study to evaluate the potential for developing an organics-to-energy project at the Town-owned Surfside Wastewater Treatment Facility (WWTF) through a grant provided by the Massachusetts Clean Energy Center (MassCEC).
Link to page -
Capacity Management Operations and Maintenance
The Capacity Management Operations and Maintenance (CMOM) repair replacement project is underway as a continuation of the Year 1 closed circuit television (CCTV) inspection work.
Link to page -
North Liberty Street Water and Sewer Replacement
The project work extends from West Chester all the way to India Street and requires daily traffic control for full road closures. Roadways will be reopened nightly.
Link to page -
Sea Street 3rd Sewer Force Main Project
The Town is implementing a sewer project that will include the installation of a new sewer force main that will connect the Sea Street Pump Station (SSPS) to the Surfside Wastewater Treatment Facility (WWTF).
Link to page -
Surfside Area Sewer Replacement Project
This project is the result of the downstream Capacity Analysis and the Sewer Master Plan. This project includes the installation of a new 15” gravity main from the new main installed in Vesper Ln. a few years ago and will continue all the way to Miacomet Ave.
Link to page