Is there a survey available of the easements locations? Has the layout for the installation of the water lines been determined as to what side of the street?

The easement plans for this new project are being developed but will not have a specific easement location marked out. It will be similar to the easement plan that was just finished by the Airport water main project on a portion of Skyline Drive. It would be difficult to map out all the laterals that will be run to each property. The design engineers are still determining the side of the street the water line will run and will have final plans completed for the state to review by early November.

 

Show All Answers

1. For residents of Skyline Drive and Webster Avenue (private roads), where can the signed and notarized easement documents be sent once fully executed?
2. Does the Board of Water Commissioners offer waivers of the water connection permit fees for covenant lots like the Select Board does for sewer connection permit fees?
3. Is the Town/Airport Commission going to test private wells in the water main expansion area?
4. What is the time frame for putting in this system?
5. How much is the water main costing the Town?
6. How is the Town paying for the water main?
7. Will hook-ups be optional or mandatory?
8. What is the fee to tie in at a later date if an owner in the water main expansion does not tie into Town water immediately?
9. Will water connections likely follow similar paths to the houses as utilities?
10. Is there a survey available of the easements locations? Has the layout for the installation of the water lines been determined as to what side of the street?
11. Will homeowners bear costs of connection to the house from the water main stubs?
12. Can existing private wells remain as the water supply for irrigation purposes?