How much Town funding has already been authorized for the roadway projects?

To date $2,534,800 has been allocated to these transportation projects for conceptual design and permitting for all Phases:

  • Article 10 2016 ATM authorizing the Town to borrow $1,000,000 for costs associated with the Boulevarde, Lovers Lane and Okorwaw Avenue reconstruction; 
  • Article 10 2017 ATM approving $1,000,000 from Real Estate Sales for costs associated with the Boulevarde, Lovers Lane and Okorwaw Avenue reconstruction; and  
  • Article 10 2018 ATM approving $534,800 Free Cash for costs associated with Surfside area reconstruction (Lovers Lane, Okorwaw Avenue, Monohansett Road).   

A portion of these funds has also been used to advance the Lovers Lane segment (Phase 2) into engineering design.  The Town intends to seek and additional $13.0M at the 2023 ATM in hopes of having funding in place to complete the entire project consecutively.

Show All Answers

1. Will the road be dug up/resurfaced? Any cost to homeowner?
2. Will there be bike paths with the roadway enhancements?
3. What is the timeframe for renovating these roads and installing the bike paths?
4. Will the roadways trenched paved only or will they be reconstructed and paved curb-to-curb?
5. How much Town funding has already been authorized for the roadway projects?
6. Will the large puddles and drainage issues be addressed with these roadway projects?
7. How much are these roadway and sidepath projects costing the Town?